Detalles de la compañía

  • Hebei TianGuan Filter Press Co., Ltd.

  •  [Hebei,China]
  • Tipo de Negocio:Fabricante , Compañía de comercio
  • Main Mark: África , Américas , Asia , caribe , Europa del este , Europa , medio Este , norte de Europa , Oceanía , Otros Mercados , Europa occidental , En todo el mundo
  • Exportador:61% - 70%
  • certs:COS, ISO9001, CE
Buzón de Consultas (0)

Hebei TianGuan Filter Press Co., Ltd.

86-317-5205930

Inicio > Información de la industria > How to main fiter press
PRODUCTOS POR GRUPO
Servicio en línea
Información de la industria

How to main fiter press

2018-07-19

1, before driving the pump should be filled with liquid to be transported (such as the pump is suction on the case), close the exit gate valve, connect the power. 2, turn on the power, check the pump steering is correct. 3, the unit test run 5-10 minutes, if no abnormalities can be put into operation. 4, downtime, the gate valve should be closed first, and then cut off the power. Maintenance and maintenance: 1, regular inspection of pumps and motors, replacement of vulnerable parts. 2, long-term downtime, should clean the pump flow channel and cut off the power. 3, is strictly prohibited air transport.

Related Products

Related Industry Information
Contactar Proveedor?Proveed
Arno Hao Mr. Arno Hao
¿Qué puedo hacer por ti?
Contactar Proveedor